Grain Drying and Storage Facility, Compton

Case Study>>Mayfield Farm, Compton, Newbury Client>>Beeswax Dyson Farming Ltd Project>>Construction of a grain drying and storage facility including the demolition of an existing building In December 2017, GP Planning Ltd successfully secured planning permission for the construction of a Grain Drying and Storage Facility at Mayfield Farm, Compton on behalf of Beeswax Dyson Farming Ltd…

Thermophilic Aerobic Digestion (TAD) Facility at Pebble Hall

Case Study>> Energy from Waste>>Pebble Hall, Northamptonshire Client>>Welland Waste Management Project>>Thermophilic Aerobic Digestion (TAD) Facility   In 2014, GP Planning Ltd successfully secured planning permission for a change of use and extension to a building to house a TAD Facility at Pebble Hall, Theddingworth on behalf of Welland Waste Management Ltd and Advanced Organics. The…

GPP team at Appeal on behalf of clients

Successful Planning Appeal for new AD Facility & Planning Committee Resolution on £10m Grain Store Development

GPP are pleased to report on two recent positive planning cases: A Planning Appeal on behalf of our client Fengrain Ltd was allowed by the Secretary of State this month. The planning application sought planning permission for a proposed Anaerobic Digestion Facility, which would generate gas through the use of energy crops adjacent to Fengrain’s existing…

AD Facility for food by-products at former Colliery & Coal Disposal Point

Case Study>> Type of Development>>UK Coal Disposal Point, Follingsby Lane, Wardley, South Tyneside Client>>Tamar Energy Ltd Project>>Anaerobic Digestion Facility to generate renewable energy through the treatment of by-products of the food. The site is part of the former Wardley Colliery and UK Coal Disposal Point with stocking yard and associated railway sidings that form part…